MAST DIAGRAM
OBJECTIVE
Draw diagrams of current oil rigs and indicate lifting and softener points for third party members.
DESCRIPTION
-
The colors were selected because it is both contrasting to highlight the important spots on the mast for both colored and black and white paper.
-
Rig 63 & Rig 17: poly slings are used to reduce stress on the crane at the A leg.
-
Rig 66 & Rig 62: The spot was moved one beam farther to the right in order to reduce the stress on the mast, but it increases the stress on the crane at the A leg.
-
Rig 68: The junction near the crown has no angled beams, so softeners are added to prevent slings from slipping while lifting.

63_edited

68_edited

62_edited

63_edited
1/3
RESULTS
These diagrams will be printed and handed out as standards during the next meeting with all of the rig operation personnel.